Switzerland
CH
Switzerland
SBB CFF : Electric locomotives built before world war II
Be 4/6
Be 4/6 series
12303 to 12342. Built by SLM and BBC between 1920 and 23. 1295 KW (12303 to 312) or 1500 KW (12313 to 342), 75 km/h.
Be 4/6 12303 à 12305
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Be46_2SRG_Anim
Sandboxes between the bogies, short roof. The first 4 units have only 6 strips to maintain the cooling pipes. After refurbishement, with half the doors condemned.
Be 4/6 12306 à 12318
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Be46_3SRG_Anim
Sandboxes between the bogies, short roof. 11 strips to maintain the cooling pipes. After refurbishement, with half the doors condemned.
Be 4/6 12319 à 12328
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Be46_1SRG_Anim
No sandboxes between the bogies (fill opening in the upper sides, causing a shorter position of the builder plates), short roof, 11 strips to maintain the cooling pipes. After refurbishement, with half the doors condemned.
Be 4/6 12329 à 12342
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Be46_4SRG_Anim
Long roof, different resistance boxes on the roof (initialy, they were at the current place of the pantographs). No sandboxes between the bogies, 11 strips to maintain the cooling pipes. After refurbishement, with half the doors condemned.
Be 4/7 12500
10501 to 10506. Built by SLM / SAAS in 1921/22. 1770 KW, 80 km/h. End of services in 1976.
Be 4/7 12500
PantoMouv
3b4a
20230924
images/Suisse/CFF/LE/CFF_Be47_12500
Green livery.
Ae 3/5
10201 to 10226. Built by Sécheron between 1922 and 25. 1360 KW, 90 km/h.
Ae 3/5
Panto
3b4a4b
20120325
images/Suisse/CFF/LE/CFF_Ae35
Green livery.
Ae 3/5
Panto
4a4b
20120325
images/Suisse/CFF/LE/CFF_Ae35_P_L
Additional shutters.
Ae 3/6
Ae 3/6 I
Built from 1921 to 1929, end of service 1994. Büchli transmission.
1st series : 10601 to 10636. 1450 KW, 100 km/h (initially numbered 10300)
2nd series : 10637 to 10714. 1560 KW, 110 km/h (Ae 3/6 I-110)
Ae 3/6 I 1st series
PantoMouv
3b4a4b5a
20160327
images/Suisse/CFF/LE/CFF_Ae36I_1S
No roof resistance for the electric brake. Green livery, already modernized (closed doors).
Ae 3/6 I 2nd series
PantoMouv
3b4a4b5a
20150927
images/Suisse/CFF/LE/CFF_Ae36I
Roof resistance for the electric brake.Green livery, already modernized (closed doors).
Ae 3/6 I 2nd series
PantoMouv
4a4b5a
20170326
images/Suisse/CFF/LE/CFF_Ae36I_PI_R
Inox shutters, two pantographs. Known unit : 10706. Green livery, already modernized (closed doors).
Ae 3/6 I 2nd series
PantoMouv
4a4b5a
20170326
images/Suisse/CFF/LE/CFF_Ae36I_PUPI
Inox shutters, one pantograph, more roof resistances for the electric brake. Known units : 10674, 10691, 10712 et 10713. Green livery, already modernized (closed doors).
Ae 3/6 II
10401 to 10460. Built by SLM/MFO between 1924 and 26, end of service 1976. 1500 KW, 100 km/h.
Ae 3/6 II 1st series
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Ae36II_1S_Anim
10401 to 10420. Green livery.
Ae 3/6 II 2nd series
PantoMouv
3b4a
20120325
images/Suisse/CFF/LE/CFF_Ae36II_2S_Anim
10421 to 10460, with additional shutters. Green livery.
Ae 3/6 III
10261 to 10271. Built by Sécheron 1925/26, end of service 1980. 1360 KW, 90 km/h.
Ae 3/6 III
Panto
3b4a4b
20120325
images/Suisse/CFF/LE/CFF_Ae36III
Green livery.
Ae 4/7
10901 to 11027. Built between 1927 and 34 by SLM associated to different electicians (3 different types). 2200 or 2450 KW, 100 km/h.
Type I
Electric gear from BBC.
10901 to 38, 10952 to 72, 11003 to 8 and 11018 to 27.
Ae 4/7 Type I
PantoMouv
3b4a4b5a5b
20160327
images/Suisse/CFF/LE/CFF_Ae47_T1
Green livery, already modernized (closed doors).
Type II
Electric gear from MFO.
10973 to 11002.
Ae 4/7 Type II
PantoMouv
3b4a4b5a5b
20170326
images/Suisse/CFF/LE/CFF_Ae47_T2
Green livery, already modernized (closed doors).
Type III
Electric gear from Sécheron.
10939 to 51 and 11009 to 17.
Ae 4/7 Type III
PantoMouv
3b4a4b5a5b
20170326
images/Suisse/CFF/LE/CFF_Ae47_T3
Green livery, already modernized (closed doors). 5 inox shutters.
Ae 4/7 Type III
PantoMouv
3b4a4b5a5b
20170326
images/Suisse/CFF/LE/CFF_Ae47_T3_PU
5 inox shutters and one pantograph for the 10945, 47, 48 and 11009.
Ae 4/7 Type III
PantoMouv
3b4a4b5a5b
20170326
images/Suisse/CFF/LE/CFF_Ae47_T3_PU7_R
7 inox shutters and one pantograph for the 10941, 44, 46 and 11010.
Ae 8/14
11801, 851 and 852. Double locomotives built for the Gotthard line.
Ae 8/14 11801
PantoMouv
4a4b
20220403
images/Suisse/CFF/LE/CFF_Ae814_11801_E4
Sort of double Ae 4/7, with the same Buchli transmission. State from 1971, with boc=th pantographs on the same body.
Ae 8/14 11851
PantoMouv
4a
20230924
images/Suisse/CFF/LE/CFF_Ae814_11851_E4
Different technique (transmission). Refurbished in 1961 (with new cabins similar to the Ae 6/6). End of service in 1977.
De 6/6
15301 to 15303. Built in 1926, essentially for freight services on the Seetal line. 980 KW, 50 km/h. End of service in 1983.
De 6/6
PantoMouv
3b4a4b
20190331
images/Suisse/CFF/LE/CFF_De66_15300_Anim
Brown-red livery.